Crypto Investing Capital
  • Investing
  • Stocks
  • World News
  • Economy
  • Investing
  • Stocks
  • World News
  • Economy

Crypto Investing Capital

Investing

Munda Gold Mine Mining Progresses: First Blast

by admin June 19, 2025
June 19, 2025
Munda Gold Mine Mining Progresses: First Blast

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide an update on mining of the Starter Pit at the Munda Gold Mine, 5km from Widgiemooltha, Western Australia.

Highlights

  • First blast 17 June 2025.
  • Mining is well underway in Starter Pit.
  • Approximately 70,000 BCM mined in first month.
  • Largely free-dig to date.
  • Site preparation for Waste Dump and ROM pads completed.
Management Comment

Managing Director, Mark English, said:

“It’s a momentous time in our progression and development of the Company, we are delighted.

“Mining is in full swing and all activities are progressing as we expected. Nothing is holding us back. We are achieving our targets and are exactly where we expected to be in the mine development.

“We are pleased to be monetising our major asset in such a bullish gold market, the timing is excellent. It is a great place to be as an unhedged gold producer,” said Mr English.

Approximately 70,000 BCM (Bank Cubic Metres) of material have been mined at Munda over the first 4 weeks of operations from a pit design encapsulating 380,000 BCM. Mining to this stage has been largely free-dig with the first blast completed 17 June 2025.

Auric personnel are utilising a dry hire fleet comprising a 125t excavator and four 40t articulated ‘Moxi’ dump trucks together with relevant ancillary equipment.

Both RC grade control and blast hole drilling, together with blast supervision is managed by Kalgoorlie-based Total Drilling Services Pty Ltd.

The Company has estimated that approximately 125,000 tonnes of ore will be extracted from the Starter Pit at a grade of 1.8g/t Au1. Most of that ore will be mined toward the base of the Starter Pit, during the last two months of operations. The Starter Pit is scheduled for completion in October.

Munda has an estimated resource of 145,000 ounces of gold at a 0.5g/t cut-off2. Once the Starter Pit is finished Auric expects to complete detailed planning for a larger pit, to commence in 2026.

The Company is fully funded to mine the Starter Pit at Munda from the proceeds of gold sales from the Jeffreys Find Gold Mine near Norseman.

Click here for the full ASX Release

This post appeared first on investingnews.com

previous post
Brunswick Exploration
next post
Nifty Copper Project Virtual Site Visit

Related Posts

Top 9 Global Lithium Stocks (Updated January 2026)

January 10, 2026

Buffett Hands Over Reins, What’s Next for Berkshire’s...

May 10, 2025

Silver47 Unveils Multiple Premier Exploration Targets with Strong...

August 13, 2025

Adrian Day: Gold Far from Top, Two Triggers...

November 7, 2025

Cygnus Metals Limited: Issue of Performance Rights

July 11, 2025

Homerun Resources Inc. Announces Full Mining Permit and...

January 8, 2026

E-Power Resources Inc. Announces Tetepisca Flake Graphite Property...

November 21, 2025

Tech 5: OpenAI/Microsoft Talks Get Tense, SoftBank Floats...

June 22, 2025

CHARBONE Announces the Official Start of Civil Construction...

October 28, 2025

Silver Price Forecast: Top Trends for Silver in...

December 16, 2025

    Join our mailing list to get access to special deals, promotions, and insider information. Your exclusive benefits await! Enjoy personalized recommendations, first dibs on sales, and members-only content that makes you feel like a true VIP. Sign up now and start saving!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent Posts

    • Lead Price Forecast: Top Trends for Lead in 2026

      January 15, 2026
    • Mario Innecco: Gold, Silver Breakout — What Record Prices Really Mean

      January 15, 2026
    • Crypto Market Update: US Senate Sets January Clock on Crypto Structure Bill

      January 15, 2026
    • Osisko Intersects 748 Metres Averaging 0.27% Cu at Gaspé

      January 15, 2026
    • CoTec Holdings Corp. Notes Portfolio Company Magiron Completes Independent Definitive Feasibility Study Confirming Strong Economics and Rapid Restart Pathway

      January 15, 2026
    • 1911 Gold Positions Itself as an Emerging Gold Producer with Long-Term Growth Opportunities

      January 15, 2026

    Popular

    • 1

      Sentiment Signals Suggest Skepticism

      April 28, 2025
    • 2

      Body of Ukrainian journalist who died in Russian detention returned by Moscow with signs of torture and with missing organs

      April 30, 2025
    • 3

      Trial of gang accused of robbing Kim Kardashian at gunpoint opens in Paris

      April 28, 2025
    • 4

      Starbucks imposes new limits on what baristas can wear under their green aprons

      April 28, 2025
    • 5

      Gangs attack another town in Haiti’s central region, killing an 11-year-old child and three others

      April 29, 2025
    • 6

      Convicted Italian cardinal pulls out of conclave to choose new pope

      April 29, 2025
    • 7

      ‘Mushroom murder’ trial begins for woman accused of killing lunch guests in Australia

      April 29, 2025
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Copyright © 2025 cryptoinvestingcapital.com | All Rights Reserved